Raimondi MRT294s at work on infrastructure jobsite in Romania

Erected in August 2020, Raimondi MRT294 topless tower cranes shown in drone footage here at work on the construction of a bridge over the Danube river, situated between the Romanian cities of  Tulcea and Braila. 

The MRT294 16t, one of Raimondi’s most popular models, was chosen for the project due to its capacity at the jib tip and its hoist speed. The flattop crane remains one of the company’s bestselling models due to its lifting capacity and its durability in a variety of climates.