71st Raimondi Crane erected in Melbourne, Australia by Clark Cranes

A Raimondi luffing jib LR165 crane was erected at the Astrina 5 – 7 Irving Avenue Box Hill jobsite; the 71st Raimondi crane currently at work in Melbourne, Australia. A Desyne Developments project, Element Five was appointed as builder for the on-schedule residential construction venture. Clark Cranes erected the LR165 to a freestanding height of 42 meters with a 33.5-meter jib over a period of two days.

See the full details about the luffing LR165 erection in Melbourne, Australia